Antonella Platform – Optimization Modifications RTI

Client
Eni DICS SpA
Activity
Feed Design
Date
2024
Optimization Modifications to RTI and Detailed Engineering for the Antonella Platform – Main Activities Performed:
1.Detailed engineering for:
- Installation of a portable seawater pump with a beam for hoist support
- Modifications to the freshwater tank
- Installation of a bonza (gas cylinder) on the roof of the process module, including connection setup to the machines and structural checks, with removal of out-of-service tanks
- Restoration of platform signage, including movement scheme diagrams
- Verification of the prepared documentation and deck layout in the new plant configuration
- Certification for dismantling of G1 and G2 engines
- Electro-instrumental detailed engineering modifications
- Detailed engineering for:
- Support structures for electrical panels, for activities on the helideck and for installation of photovoltaic panels
- Revision of mechanical and electro-instrumental books
2.Review of the entire RTI optimization report, including:
- Analysis of 100% completed activities
- Issuance of revised process flow diagrams
- Issuance of updated equipment layout drawings