Antonella Platform – Column for the New 5-ton MEP Crane

Client
Eni DICS SpA
Activity
Feed Design
Date
2024
Installation of the Column for the New 5-ton MEP Crane on the “Antonella” Platform – Divided into 3 Phases:
- Feasibility Study, which includes:
– Preliminary activities (documentation analysis, site inspections, surveys, point cloud rendering, 3D modeling to verify crane interference with platform structures, alignment of the MEP offer with ENI’s supply specifications)
– Technical studies - Preparation of the technical report for UNMIG
– Structural verification of the Deck
– Drafting of the RTI - Detailed Engineering
– Structural, mechanical, and electrical design
– Engineering for Lifting and Installation Phases