Antonella Platform – Column for the New 5-ton MEP Crane

Client

Eni DICS SpA

Activity

Feed Design

Date

2024

Installation of the Column for the New 5-ton MEP Crane on the “Antonella” Platform – Divided into 3 Phases:

  1. Feasibility Study, which includes:
    – Preliminary activities (documentation analysis, site inspections, surveys, point cloud rendering, 3D modeling to verify crane interference with platform structures, alignment of the MEP offer with ENI’s supply specifications)
    – Technical studies
  2. Preparation of the technical report for UNMIG
    – Structural verification of the Deck
    – Drafting of the RTI
  3. Detailed Engineering
    – Structural, mechanical, and electrical design
    – Engineering for Lifting and Installation Phases